Mira is a digital employee for manufacturers. Mira plans the materials for the next twelve weeks over every level of the bill of materials, and turns each exception into a proposal the planner can follow.

What Mira does

Plans materials for twelve weeks and proposes how to solve every exception.

  1. Step 1

    Check the ERP extract

    Items, bills of materials, suppliers, demand and supply. Gaps reported.

  2. Step 2

    Work out the demand

    Per end product per week: the higher of forecast and orders, plus backlog.

  3. Step 3

    Net requirement per level

    Projected stock against safety stock, end product down to raw material.

  4. Step 4

    Rate the exceptions

    Critical, warning or info, depending on whether an order still helps in time.

  5. Step 5

    Propose scenarios

    Bring forward, alternative supplier, substitute, split. The planner chooses.

At work

One screen for the whole job

Every case Mira handles is visible, with its status and the points that still need a person.

Mira’s overview screen. Example data.

Human in control

The planner decides

Mira prepares the work. Your people keep the decisions and the final responsibility.

  • A critical exception is an alert: the planner looks at it today
  • The planner simulates Mira's scenarios and saves the plan they choose
  • Mira orders and changes nothing; the ERP and the supplier stay with the planner

Made to measure

Mira is close, but not quite your case?

That is the starting point. The same job is often done differently in every company, so we build every digital employee for how yours needs it done: your rules, your systems and the people who decide.

Questions about Mira Material planning (MRP)

What exactly does Mira plan?

Mira plans materials for the next twelve weeks over three levels: end product, semi-finished product and raw material or component. From one ERP extract with master data, demand and supply, they work out what has to be made and bought, propose orders and find the exceptions.

When is an exception critical?

When a new order can no longer solve a shortage in time: a shortage within the lead time, a delivery that moves past a supplier’s closure week, or a missing item. A critical exception is an alert the planner looks at today. Warnings can still become a shortage; info covers cases such as excess stock.

What do Mira’s scenarios look like?

For an article with attention points, Mira tries what the planner can do: bring an open order forward, order from an alternative supplier, use a substitute (only with the product manager’s approval), release less than the MOQ or postpone an order. They run the whole MRP again for each and show at most six.

Does Mira place or change orders?

No. Mira orders and changes nothing. The planner simulates scenarios, saves the plan they choose and carries it out in the ERP or with the supplier. Mira does not change the forecast either: signals from demand go to whoever makes it.

What happens when the master data is incomplete?

An item in a bill of materials that is missing from the item master cannot be planned, so Mira reports it as a data quality problem. An item without a lead time is planned with its supplier’s standard lead time and reported, so someone can correct the data.